Hyperlinked
Ontario Building Code
Search
Search
Dark mode
Light mode
Explorer
◉
❯
Volume 1
❯
Division B
Folder: volume-1/division-b/part-3
708 items under this folder.
Feb 03, 2026
3. Fire Protection, Occupant Safety and Accessibility
Feb 03, 2026
3.1.1.1. Scope
Feb 03, 2026
3.1.1.2. Defined Words
Feb 03, 2026
3.1.1.3. Reserved
Feb 03, 2026
3.1.1.4. Reserved
Feb 03, 2026
3.1.1.5. Radon
Feb 03, 2026
3.1.1.6. Building in Flood Plains
Feb 03, 2026
3.1.10.1. Prevention of Firewall Collapse
Feb 03, 2026
3.1.10.2. Rating of Firewalls
Feb 03, 2026
3.1.10.3. Continuity of Firewalls
Feb 03, 2026
3.1.10.4. Parapets
Feb 03, 2026
3.1.10.5. Maximum Openings
Feb 03, 2026
3.1.10.6. Exposure Protection for Adjacent Walls
Feb 03, 2026
3.1.10.7. Combustible Projections
Feb 03, 2026
3.1.11.1. Separation of Concealed Spaces
Feb 03, 2026
3.1.11.2. Fire Blocks in Wall Assemblies
Feb 03, 2026
3.1.11.3. Fire Blocks Between Nailing and Supporting Elements
Feb 03, 2026
3.1.11.4. Fire Blocks Between Vertical and Horizontal Spaces
Feb 03, 2026
3.1.11.5. Fire Blocks in Horizontal Concealed Spaces
Feb 03, 2026
3.1.11.6. Fire Blocks in Crawl Spaces
Feb 03, 2026
3.1.11.7. Fire Block Materials
Feb 03, 2026
3.1.12.1. Determination of Ratings
Feb 03, 2026
3.1.13.1. Interior Finishes, Furnishings and Decorative Materials
Feb 03, 2026
3.1.13.10. Exterior Exit Passageway
Feb 03, 2026
3.1.13.11. Elevator Cars
Feb 03, 2026
3.1.13.12. Encapsulated Mass Timber Construction
Feb 03, 2026
3.1.13.2. Flame-Spread Rating
Feb 03, 2026
3.1.13.3. Bathrooms in Residential Suites
Feb 03, 2026
3.1.13.4. Light Diffusers and Lenses
Feb 03, 2026
3.1.13.5. Skylights
Feb 03, 2026
3.1.13.6. Corridors
Feb 03, 2026
3.1.13.7. High Buildings
Feb 03, 2026
3.1.13.8. Noncombustible Construction
Feb 03, 2026
3.1.13.9. Underground Walkways
Feb 03, 2026
3.1.14.1. Fire-Retardant-Treated Wood Roof Systems
Feb 03, 2026
3.1.14.2. Metal Roof Deck Assemblies
Feb 03, 2026
3.1.15.1. Roof Covering Classification
Feb 03, 2026
3.1.15.2. Roof Coverings
Feb 03, 2026
3.1.16.1. Fabric Awnings, Canopies and Marquees
Feb 03, 2026
3.1.17.1. Occupant Load Determination
Feb 03, 2026
3.1.17.2. Public Pools
Feb 03, 2026
3.1.19.1. Drainage
Feb 03, 2026
3.1.2.1. Classification of Buildings
Feb 03, 2026
3.1.2.2. Occupancies of the Same Classification
Feb 03, 2026
3.1.2.3. Arena-Type Buildings
Feb 03, 2026
3.1.2.4. Police Stations
Feb 03, 2026
3.1.2.5. Group B, Division 3 Occupancies
Feb 03, 2026
3.1.2.6. Storage of Combustible Fibres
Feb 03, 2026
3.1.2.7. Restaurants
Feb 03, 2026
3.1.20.1. Clearance to Buildings
Feb 03, 2026
3.1.21.1. Glass
Feb 03, 2026
3.1.3.1. Separation of Major Occupancies
Feb 03, 2026
3.1.3.2. Prohibition of Occupancy Combinations
Feb 03, 2026
3.1.4.1. Combustible Materials Permitted
Feb 03, 2026
3.1.4.2. Protection of Foamed Plastics
Feb 03, 2026
3.1.4.3. Wires and Cables
Feb 03, 2026
3.1.4.4. Non-metallic Raceways
Feb 03, 2026
3.1.4.5. Fire-Retardant-Treated Wood
Feb 03, 2026
3.1.4.6. Heavy Timber Construction Alternative
Feb 03, 2026
3.1.4.7. Heavy Timber Construction
Feb 03, 2026
3.1.4.8. Cladding
Feb 03, 2026
3.1.5.1. Noncombustible Materials
Feb 03, 2026
3.1.5.10. Combustible Flooring Elements
Feb 03, 2026
3.1.5.11. Combustible Stairs in Dwelling Units
Feb 03, 2026
3.1.5.12. Combustible Interior Finishes
Feb 03, 2026
3.1.5.13. Gypsum Board
Feb 03, 2026
3.1.5.14. Combustible Insulation
Feb 03, 2026
3.1.5.15. Foamed Plastic Insulation
Feb 03, 2026
3.1.5.16. Combustible Elements in Partitions
Feb 03, 2026
3.1.5.17. Storage Lockers in Residential Buildings
Feb 03, 2026
3.1.5.18. Combustible Ducts
Feb 03, 2026
3.1.5.19. Combustible Piping Materials
Feb 03, 2026
3.1.5.2. Minor Combustible Components
Feb 03, 2026
3.1.5.20. Combustible Plumbing Fixtures
Feb 03, 2026
3.1.5.21. Wires and Cables
Feb 03, 2026
3.1.5.22. Combustible Travelling Cables for Elevators
Feb 03, 2026
3.1.5.23. Non-metallic Raceways
Feb 03, 2026
3.1.5.24. Wood Decorative Cladding
Feb 03, 2026
3.1.5.25. Wires in Computer Room Floors
Feb 03, 2026
3.1.5.26. Combustible Components in Public Pools and Public Spas
Feb 03, 2026
3.1.5.27. Combustible Mezzanines
Feb 03, 2026
3.1.5.28. Combustible Solar Collector Systems
Feb 03, 2026
3.1.5.29. Marquees Having Combustible Elements
Feb 03, 2026
3.1.5.3. Combustible Roofing Materials
Feb 03, 2026
3.1.5.4. Combustible Windows, Glazing and Skylights
Feb 03, 2026
3.1.5.5. Combustible Cladding on Exterior Walls
Feb 03, 2026
3.1.5.6. Combustible Components in Exterior Walls
Feb 03, 2026
3.1.5.7. Factory-Assembled Panels
Feb 03, 2026
3.1.5.8. Nailing Elements
Feb 03, 2026
3.1.5.9. Combustible Millwork
Feb 03, 2026
3.1.6.1. Scope
Feb 03, 2026
3.1.6.10. Combustible Components in Exterior Walls
Feb 03, 2026
3.1.6.11. Nailing Elements
Feb 03, 2026
3.1.6.12. Combustible Flooring Elements
Feb 03, 2026
3.1.6.13. Combustible Stairs
Feb 03, 2026
3.1.6.14. Combustible Interior Finishes
Feb 03, 2026
3.1.6.15. Combustible Elements in Partitions
Feb 03, 2026
3.1.6.16. Exposed Construction Materials and Components in Concealed Spaces
Feb 03, 2026
3.1.6.17. Penetration by Outlet Boxes
Feb 03, 2026
3.1.6.2. Materials Permitted
Feb 03, 2026
3.1.6.3. Structural Mass Timber Elements
Feb 03, 2026
3.1.6.4. Encapsulation of Mass Timber Elements
Feb 03, 2026
3.1.6.5. Determination of Encapsulation Ratings
Feb 03, 2026
3.1.6.6. Encapsulation Materials
Feb 03, 2026
3.1.6.7. Combustible Roofing Materials
Feb 03, 2026
3.1.6.8. Combustible Window Sashes and Frames
Feb 03, 2026
3.1.6.9. Exterior Cladding
Feb 03, 2026
3.1.7.1. Determination of Ratings
Feb 03, 2026
3.1.7.2. Exception for Exterior Walls
Feb 03, 2026
3.1.7.3. Exposure Conditions for Rating
Feb 03, 2026
3.1.7.4. Minimum Fire-Resistance Rating
Feb 03, 2026
3.1.7.5. Rating of Supporting Construction
Feb 03, 2026
3.1.8.1. General Requirements
Feb 03, 2026
3.1.8.10. Installation of Fire Dampers
Feb 03, 2026
3.1.8.11. Installation of Smoke Dampers
Feb 03, 2026
3.1.8.12. Twenty-Minute Closures
Feb 03, 2026
3.1.8.13. Self-Closing Devices
Feb 03, 2026
3.1.8.14. Hold-Open Devices
Feb 03, 2026
3.1.8.15. Door Latches
Feb 03, 2026
3.1.8.16. Wired Glass and Glass Block
Feb 03, 2026
3.1.8.17. Temperature Rise Limit for Doors
Feb 03, 2026
3.1.8.18. Area Limits for Wired Glass, Glass Block and Safety Glazing
Feb 03, 2026
3.1.8.19. Temperature Rise and Area Limits Waived
Feb 03, 2026
3.1.8.2. Combustible Construction Support
Feb 03, 2026
3.1.8.20. Sprinkler Protected Glazed Wall Assembly
Feb 03, 2026
3.1.8.3. Continuity of Fire Separations
Feb 03, 2026
3.1.8.4. Determination of Ratings and Classifications
Feb 03, 2026
3.1.8.5. Installation of Closures
Feb 03, 2026
3.1.8.6. Maximum Openings
Feb 03, 2026
3.1.8.7. Location of Fire Dampers and Smoke Dampers
Feb 03, 2026
3.1.8.8. Fire Dampers Waived
Feb 03, 2026
3.1.8.9. Smoke Dampers Waived
Feb 03, 2026
3.1.9.1. Firestops
Feb 03, 2026
3.1.9.2. Service Equipment Penetrations
Feb 03, 2026
3.1.9.3. Penetration by Outlet Boxes
Feb 03, 2026
3.1.9.4. Combustible Piping Penetrations
Feb 03, 2026
3.1.9.5. Openings Through a Membrane Ceiling
Feb 03, 2026
3.1.9.6. Plenums
Feb 03, 2026
3.10.1.1. Application
Feb 03, 2026
3.10.2.1. Occupancy Classification
Feb 03, 2026
3.10.2.2. Occupant Load
Feb 03, 2026
3.10.2.3. Structural Fire Protection
Feb 03, 2026
3.10.2.4. Safety Requirements Within Floor Areas
Feb 03, 2026
3.10.2.5. Exit Requirements
Feb 03, 2026
3.10.2.6. Service Facilities
Feb 03, 2026
3.10.2.7. Sanitary Facilities
Feb 03, 2026
3.10.3.1. Application
Feb 03, 2026
3.10.3.2. Spatial Separations
Feb 03, 2026
3.10.3.3. Fire Alarm Systems
Feb 03, 2026
3.10.3.4. Provisions for Firefighting
Feb 03, 2026
3.10.3.5. Standpipe Systems
Feb 03, 2026
3.10.4.1. Application
Feb 03, 2026
3.10.4.2. Building Area
Feb 03, 2026
3.10.4.3. Spatial Separations
Feb 03, 2026
3.10.4.4. Fire Alarm Systems
Feb 03, 2026
3.10.4.5. Provisions for Firefighting
Feb 03, 2026
3.11.1.1. Application
Feb 03, 2026
3.11.10.1. Lighting and Emergency Provisions
Feb 03, 2026
3.11.11.1. Service Rooms and Storage Facilities
Feb 03, 2026
3.11.2.1. Pool Designations
Feb 03, 2026
3.11.3.1. Construction Requirements
Feb 03, 2026
3.11.3.2. Barrier-Free Path of Travel for Outdoor Pool Deck
Feb 03, 2026
3.11.3.3. Access into Public Pools
Feb 03, 2026
3.11.4.1. Diving Boards or Platforms
Feb 03, 2026
3.11.5.1. Ramps into Public Pools
Feb 03, 2026
3.11.5.2. Public Pools in Group B, Division 2 or 3 Major Occupancies
Feb 03, 2026
3.11.6.1. Construction Requirements
Feb 03, 2026
3.11.7.1. Construction Requirements
Feb 03, 2026
3.11.8.1. Recirculation Systems
Feb 03, 2026
3.11.9.1. Dressing Rooms and Sanitary Facilities
Feb 03, 2026
3.12.1.1. Application
Feb 03, 2026
3.12.2.1. Construction Requirements
Feb 03, 2026
3.12.3.1. Ramps into Public Spas
Feb 03, 2026
3.12.3.2. Access into Public Spas
Feb 03, 2026
3.12.4.1. Water Circulation Systems
Feb 03, 2026
3.12.5.1. Lighting and Emergency Provisions
Feb 03, 2026
3.12.6.1. Service Rooms and Storage Facilities
Feb 03, 2026
3.13.1.1. Scope
Feb 03, 2026
3.13.1.2. Definitions
Feb 03, 2026
3.13.2.1. Requirements for Stations
Feb 03, 2026
3.13.3.1. Application
Feb 03, 2026
3.13.3.2. Booths and Kiosks
Feb 03, 2026
3.13.3.3. Service Rooms and Ancillary Spaces
Feb 03, 2026
3.13.3.4. Leased Areas
Feb 03, 2026
3.13.3.5. Vehicle Terminal
Feb 03, 2026
3.13.3.6. Access to Adjacent Building
Feb 03, 2026
3.13.3.7. Emergency Lighting
Feb 03, 2026
3.13.3.8. Guards for Rapid Transit Stations
Feb 03, 2026
3.13.4.1. Occupant Load
Feb 03, 2026
3.13.4.2. General Requirements
Feb 03, 2026
3.13.4.3. Number and Location of Means of Egress
Feb 03, 2026
3.13.4.4. Egress Capacity
Feb 03, 2026
3.13.4.5. Width of Means of Egress
Feb 03, 2026
3.13.4.6. Egress Facilities
Feb 03, 2026
3.13.5.1. Fire Alarm System
Feb 03, 2026
3.13.5.10. Sprinkler Systems
Feb 03, 2026
3.13.5.11. Standpipe and Hose Systems
Feb 03, 2026
3.13.5.2. Exceptions
Feb 03, 2026
3.13.5.3. Fire Detectors
Feb 03, 2026
3.13.5.4. Central Supervising Station
Feb 03, 2026
3.13.5.5. Annunciators
Feb 03, 2026
3.13.5.6. Annunciator Indication
Feb 03, 2026
3.13.5.7. Emergency Power
Feb 03, 2026
3.13.5.8. Communication Systems
Feb 03, 2026
3.13.5.9. Emergency Reporting Devices
Feb 03, 2026
3.13.6.1. Application
Feb 03, 2026
3.13.6.2. Washrooms Required
Feb 03, 2026
3.13.7.1. Application
Feb 03, 2026
3.13.8.1. Application
Feb 03, 2026
3.13.8.2. Exception
Feb 03, 2026
3.13.8.3. Elevator Requirements
Feb 03, 2026
3.13.8.4. Emergency Operation of Elevators
Feb 03, 2026
3.13.8.5. Washrooms Required to be Barrier-Free
Feb 03, 2026
3.14.1.1. Application
Feb 03, 2026
3.14.1.10. Electrical Systems
Feb 03, 2026
3.14.1.2. General
Feb 03, 2026
3.14.1.3. Means of Egress
Feb 03, 2026
3.14.1.4. Clearance to Other Structures
Feb 03, 2026
3.14.1.5. Clearances to Flammable Material
Feb 03, 2026
3.14.1.6. Flame Resistance
Feb 03, 2026
3.14.1.7. Bleachers
Feb 03, 2026
3.14.1.8. Sanitary Facilities
Feb 03, 2026
3.14.1.9. Provision for Firefighting
Feb 03, 2026
3.14.2.1. Application
Feb 03, 2026
3.14.2.2. General
Feb 03, 2026
3.14.2.3. Spatial Separation
Feb 03, 2026
3.14.2.4. Clearances to Flammable Material
Feb 03, 2026
3.14.2.5. Flame Resistance
Feb 03, 2026
3.14.2.6. Emergency Air Supply
Feb 03, 2026
3.14.2.7. Electrical Systems
Feb 03, 2026
3.15.1.1. Application
Feb 03, 2026
3.15.1.2. Exceptions
Feb 03, 2026
3.15.2.1. Exceptions for Alterations
Feb 03, 2026
3.15.3.1. Structural Design
Feb 03, 2026
3.15.4.1. Combustible Sign Faces
Feb 03, 2026
3.15.5.1. Obstructions not Permitted
Feb 03, 2026
3.15.5.2. Clearance for Exterior Signs
Feb 03, 2026
3.16.1.1. Application
Feb 03, 2026
3.16.1.2. General
Feb 03, 2026
3.16.1.3. Construction
Feb 03, 2026
3.16.1.4. Signs
Feb 03, 2026
3.16.1.5. Lighting
Feb 03, 2026
3.16.1.6. Sprinkler System
Feb 03, 2026
3.16.1.7. Exits and Means of Egress
Feb 03, 2026
3.16.2.1. Application
Feb 03, 2026
3.16.2.2. Construction
Feb 03, 2026
3.16.3.1. Application
Feb 03, 2026
3.16.3.2. Construction
Feb 03, 2026
3.17.1.1. Application
Feb 03, 2026
3.17.2.1. Occupant Load
Feb 03, 2026
3.17.2.2. Means of Egress
Feb 03, 2026
3.17.2.3. Guards
Feb 03, 2026
3.17.2.4. Clearance to Other Structures
Feb 03, 2026
3.17.2.5. Flame Resistance
Feb 03, 2026
3.17.2.6. Provision for Firefighting
Feb 03, 2026
3.17.2.7. Electrical Systems
Feb 03, 2026
3.17.2.8. Structural Provisions
Feb 03, 2026
3.17.2.9. Barrier-Free Design
Feb 03, 2026
3.18.1.1. Application
Feb 03, 2026
3.18.2.1. Change of Use and Compensating Construction
Feb 03, 2026
3.18.2.2. Performance Level and Compensating Construction
Feb 03, 2026
3.2.1.1. Exceptions in Determining Building Height
Feb 03, 2026
3.2.1.2. Storage Garage Considered as a Separate Building
Feb 03, 2026
3.2.1.3. Roof Considered as a Wall
Feb 03, 2026
3.2.1.4. Floor Assembly Over Basement
Feb 03, 2026
3.2.1.5. Fire Containment in Basements
Feb 03, 2026
3.2.1.6. Mezzanines
Feb 03, 2026
3.2.2.1. Application
Feb 03, 2026
3.2.2.10. Streets
Feb 03, 2026
3.2.2.11. Exterior Balconies
Feb 03, 2026
3.2.2.12. Exterior Passageways
Feb 03, 2026
3.2.2.13. Occupancy on Roof
Feb 03, 2026
3.2.2.14. Rooftop Enclosures
Feb 03, 2026
3.2.2.15. Storeys Below Ground
Feb 03, 2026
3.2.2.16. Heavy Timber Roof Permitted
Feb 03, 2026
3.2.2.17. Roof Assemblies and Mezzanines in Gymnasiums, Swimming Pools, Arenas and Rinks
Feb 03, 2026
3.2.2.18. Automatic Sprinkler System Required
Feb 03, 2026
3.2.2.19. Buildings Containing Impeded Egress Zones
Feb 03, 2026
3.2.2.2. Special and Unusual Structures
Feb 03, 2026
3.2.2.20. Group A, Division 1, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.21. Group A, Division 1, One Storey, Limited Area, Sprinklered
Feb 03, 2026
3.2.2.22. Group A, Division 1, One Storey, Sprinklered
Feb 03, 2026
3.2.2.23. Group A, Division 2, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.24. Group A, Division 2, up to 6 Storeys, Any Area, Sprinklered
Feb 03, 2026
3.2.2.25. Group A, Division 2, up to 2 Storeys
Feb 03, 2026
3.2.2.26. Group A, Division 2, up to 2 Storeys, Increased Area, Sprinklered
Feb 03, 2026
3.2.2.27. Group A, Division 2, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.28. Group A, Division 2, One Storey
Feb 03, 2026
3.2.2.29. Group A, Division 3, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.3. Exceptions to Structural Fire Protection
Feb 03, 2026
3.2.2.30. Group A, Division 3, up to 2 Storeys
Feb 03, 2026
3.2.2.31. Group A, Division 3, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.32. Group A, Division 3, One Storey, Increased Area
Feb 03, 2026
3.2.2.33. Group A, Division 3, One Storey, Sprinklered
Feb 03, 2026
3.2.2.34. Group A, Division 3, One Storey
Feb 03, 2026
3.2.2.35. Group A, Division 4
Feb 03, 2026
3.2.2.36. Group B, Division 1, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.37. Group B, Division 1, up to 3 Storeys, Sprinklered
Feb 03, 2026
3.2.2.38. Group B, Division 2, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.39. Group B, Division 2, up to 3 Storeys, Sprinklered
Feb 03, 2026
3.2.2.4. Buildings with Multiple Major Occupancies
Feb 03, 2026
3.2.2.40. Group B, Division 2, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.41. Group B, Division 2, One Storey, Sprinklered
Feb 03, 2026
3.2.2.42. Group B, Division 3, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.43. Group B, Division 3, Up to 3 Storeys, (Noncombustible), Sprinklered
Feb 03, 2026
3.2.2.44. Group B, Division 3, Up to 3 Storeys, Sprinklered
Feb 03, 2026
3.2.2.45. Group B, Division 3, Up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.46. Group B, Division 3, One Storey, Sprinklered
Feb 03, 2026
3.2.2.47. Group C, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.48. Group C, up to 12 Storeys, Sprinklered, Encapsulated Mass Timber Construction
Feb 03, 2026
3.2.2.49. Group C, up to 6 Storeys, Sprinklered, Noncombustible Construction
Feb 03, 2026
3.2.2.5. Applicable Building Height and Area
Feb 03, 2026
3.2.2.50. Group C, up to 4 Storeys, Noncombustible Construction
Feb 03, 2026
3.2.2.51. Group C, up to 6 Storeys, Sprinklered, Combustible Construction
Feb 03, 2026
3.2.2.52. Group C, up to 4 Storeys, Sprinklered
Feb 03, 2026
3.2.2.53. Group C, up to 3 Storeys, Increased Area
Feb 03, 2026
3.2.2.54. Group C, up to 3 Storeys
Feb 03, 2026
3.2.2.55. Group C, up to 3 Storeys, Sprinklered
Feb 03, 2026
3.2.2.55A. Group C, Retirement Home, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.55B. Group C, Retirement Home, up to 4 Storeys, Sprinklered, Increased Area
Feb 03, 2026
3.2.2.55C. Group C, Retirement Home, up to 4 Storeys, Sprinklered
Feb 03, 2026
3.2.2.55D. Group C, Retirement Home, up to 3 Storeys, Sprinklered, Noncombustible Construction
Feb 03, 2026
3.2.2.55E. Group C, Retirement Home, up to 3 Storeys, Sprinklered, Combustible Construction
Feb 03, 2026
3.2.2.56. Group D, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.57. Group D, up to 12 Storeys, Sprinklered, Encapsulated Mass Timber Construction
Feb 03, 2026
3.2.2.58. Group D, up to 6 Storeys
Feb 03, 2026
3.2.2.59. Group D, up to 6 Storeys, Sprinklered, Noncombustible Construction
Feb 03, 2026
3.2.2.6. Multiple Major Occupancies
Feb 03, 2026
3.2.2.60. Group D, up to 6 Storeys, Sprinklered
Feb 03, 2026
3.2.2.61. Group D, up to 4 Storeys, Sprinklered
Feb 03, 2026
3.2.2.62. Group D, up to 3 Storeys
Feb 03, 2026
3.2.2.63. Group D, up to 3 Storeys, Sprinklered
Feb 03, 2026
3.2.2.64. Group D, up to 2 Storeys
Feb 03, 2026
3.2.2.65. Group D, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.66. Group E, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.67. Group E, up to 4 Storeys, Sprinklered
Feb 03, 2026
3.2.2.68. Group E, up to 3 Storeys
Feb 03, 2026
3.2.2.69. Group E, up to 3 Storeys, Sprinklered
Feb 03, 2026
3.2.2.7. Superimposed Major Occupancies
Feb 03, 2026
3.2.2.70. Group E, up to 2 Storeys
Feb 03, 2026
3.2.2.71. Group E, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.72. Group F, Division 1, up to 4 Storeys, Sprinklered
Feb 03, 2026
3.2.2.73. Group F, Division 1, up to 3 Storeys, Sprinklered
Feb 03, 2026
3.2.2.74. Group F, Division 1, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.75. Group F, Division 1, One Storey
Feb 03, 2026
3.2.2.76. Group F, Division 2, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.77. Group F, Division 2, up to 4 Storeys, Increased Area, Sprinklered
Feb 03, 2026
3.2.2.78. Group F, Division 2, up to 3 Storeys
Feb 03, 2026
3.2.2.79. Group F, Division 2, up to 4 Storeys, Sprinklered
Feb 03, 2026
3.2.2.8. Exceptions for Major Occupancies
Feb 03, 2026
3.2.2.80. Group F, Division 2, up to 2 Storeys
Feb 03, 2026
3.2.2.81. Group F, Division 2, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.82. Group F, Division 3, Any Height, Any Area, Sprinklered
Feb 03, 2026
3.2.2.83. Group F, Division 3, up to 6 Storeys
Feb 03, 2026
3.2.2.84. Group F, Division 3, up to 6 Storeys, Sprinklered
Feb 03, 2026
3.2.2.85. Group F, Division 3, up to 4 Storeys
Feb 03, 2026
3.2.2.86. Group F, Division 3, up to 4 Storeys, Sprinklered
Feb 03, 2026
3.2.2.87. Group F, Division 3, up to 2 Storeys
Feb 03, 2026
3.2.2.88. Group F, Division 3, up to 2 Storeys, Sprinklered
Feb 03, 2026
3.2.2.89. Group F, Division 3, One Storey
Feb 03, 2026
3.2.2.9. Crawl Spaces
Feb 03, 2026
3.2.2.90. Group F, Division 3, One Storey, Sprinklered
Feb 03, 2026
3.2.2.91. Group F, Division 3, One Storey, Any Area, Low Fire Load Occupancy
Feb 03, 2026
3.2.2.92. Group F, Division 3, Storage Garages up to 22 m High
Feb 03, 2026
3.2.2.93. Encapsulated Mass Timber Construction, Various Occupancies, Heights and Areas, Sprinklered
Feb 03, 2026
3.2.3.1. Limiting Distance and Area of Unprotected Openings
Feb 03, 2026
3.2.3.10. Unlimited Unprotected Openings
Feb 03, 2026
3.2.3.11. Low Fire Load, One Storey Building
Feb 03, 2026
3.2.3.12. Area Increase for Unprotected Openings
Feb 03, 2026
3.2.3.13. Protection of Exit Facilities
Feb 03, 2026
3.2.3.14. Wall Exposed to Another Wall
Feb 03, 2026
3.2.3.15. Wall Exposed to Adjoining Roof
Feb 03, 2026
3.2.3.16. Protection of Soffits
Feb 03, 2026
3.2.3.17. Canopy Protection for Vertically Separated Openings
Feb 03, 2026
3.2.3.18. Covered Vehicular Passageway
Feb 03, 2026
3.2.3.19. Walkway Between Buildings
Feb 03, 2026
3.2.3.2. Area of Exposing Building Face
Feb 03, 2026
3.2.3.20. Underground Walkway
Feb 03, 2026
3.2.3.21. Reserved
Feb 03, 2026
3.2.3.22. Service Lines Under Buildings
Feb 03, 2026
3.2.3.3. Wall Enclosing Attic or Roof Space
Feb 03, 2026
3.2.3.4. Reserved
Feb 03, 2026
3.2.3.5. Wall With Limiting Distance Less Than 1.2 m
Feb 03, 2026
3.2.3.6. Combustible Projections
Feb 03, 2026
3.2.3.7. Construction of Exposing Building Face
Feb 03, 2026
3.2.3.8. Protection of Exterior Building Face
Feb 03, 2026
3.2.3.9. Protection of Structural Members
Feb 03, 2026
3.2.4.1. Determination of Requirement for a Fire Alarm System
Feb 03, 2026
3.2.4.10. Fire Detectors
Feb 03, 2026
3.2.4.11. Smoke and Heat Detectors
Feb 03, 2026
3.2.4.12. Prevention of Smoke Circulation
Feb 03, 2026
3.2.4.13. Vacuum Cleaning System Shutdown
Feb 03, 2026
3.2.4.14. Elevator Emergency Return
Feb 03, 2026
3.2.4.15. System Monitoring
Feb 03, 2026
3.2.4.16. Manual Stations
Feb 03, 2026
3.2.4.17. Alert and Alarm Signals
Feb 03, 2026
3.2.4.18. Audibility of Alarm Systems
Feb 03, 2026
3.2.4.19. Visible Signals
Feb 03, 2026
3.2.4.2. Continuity of Fire Alarm System
Feb 03, 2026
3.2.4.20. Smoke Alarms
Feb 03, 2026
3.2.4.21. Residential Fire Warning Systems
Feb 03, 2026
3.2.4.22. Two-Way Voice Communication Systems
Feb 03, 2026
3.2.4.23. One-Way Voice Communication Systems
Feb 03, 2026
3.2.4.3. Types of Fire Alarm Systems
Feb 03, 2026
3.2.4.4. Description of Fire Alarm Systems
Feb 03, 2026
3.2.4.5. Installation and Verification of Fire Alarm Systems
Feb 03, 2026
3.2.4.6. Silencing of Alarm Signals
Feb 03, 2026
3.2.4.7. Signals to Fire Department
Feb 03, 2026
3.2.4.8. Annunciator and Zone Indication
Feb 03, 2026
3.2.4.9. Electrical Supervision
Feb 03, 2026
3.2.5.1. Access to Above Grade Storeys
Feb 03, 2026
3.2.5.10. Hose Connections
Feb 03, 2026
3.2.5.11. Hose Stations
Feb 03, 2026
3.2.5.12. Automatic Sprinkler Systems
Feb 03, 2026
3.2.5.13. Combustible Sprinkler Piping
Feb 03, 2026
3.2.5.14. Sprinklered Service Space
Feb 03, 2026
3.2.5.15. Fire Department Connections
Feb 03, 2026
3.2.5.16. Portable Fire Extinguishers
Feb 03, 2026
3.2.5.17. Protection from Freezing
Feb 03, 2026
3.2.5.18. Fire Pumps
Feb 03, 2026
3.2.5.2. Access to Basements
Feb 03, 2026
3.2.5.3. Roof Access
Feb 03, 2026
3.2.5.4. Access Routes
Feb 03, 2026
3.2.5.5. Location of Access Routes
Feb 03, 2026
3.2.5.6. Access Route Design
Feb 03, 2026
3.2.5.7. Water Supply
Feb 03, 2026
3.2.5.8. Standpipe Systems
Feb 03, 2026
3.2.5.9. Standpipe System Design
Feb 03, 2026
3.2.6.1. Application
Feb 03, 2026
3.2.6.2. Limits to Smoke Movement
Feb 03, 2026
3.2.6.3. Connected Buildings
Feb 03, 2026
3.2.6.4. Emergency Operation of Elevators
Feb 03, 2026
3.2.6.5. Elevator for Use by Firefighters
Feb 03, 2026
3.2.6.6. Venting to Aid Firefighting
Feb 03, 2026
3.2.6.7. Central Alarm and Control Facility
Feb 03, 2026
3.2.6.8. Voice Communication System
Feb 03, 2026
3.2.6.9. Testing
Feb 03, 2026
3.2.7.1. Minimum Lighting Requirements
Feb 03, 2026
3.2.7.10. Protection of Electrical Conductors
Feb 03, 2026
3.2.7.2. Recessed Lighting Fixtures
Feb 03, 2026
3.2.7.3. Emergency Lighting
Feb 03, 2026
3.2.7.4. Emergency Power for Lighting
Feb 03, 2026
3.2.7.5. Emergency Power Supply Installation
Feb 03, 2026
3.2.7.6. Emergency Power for Hospitals
Feb 03, 2026
3.2.7.7. Fuel Supply Shut-Off Valves and Exhaust Pipes
Feb 03, 2026
3.2.7.8. Emergency Power for Fire Alarm Systems
Feb 03, 2026
3.2.7.9. Emergency Power for Building Services
Feb 03, 2026
3.2.8.1. Application
Feb 03, 2026
3.2.8.2. Exceptions to Special Protection
Feb 03, 2026
3.2.8.3. Sprinklers
Feb 03, 2026
3.2.8.4. Vestibules
Feb 03, 2026
3.2.8.5. Protected Floor Space
Feb 03, 2026
3.2.8.6. Draft Stops
Feb 03, 2026
3.2.8.7. Mechanical Exhaust System
Feb 03, 2026
3.2.8.8. Combustible Content Limits
Feb 03, 2026
3.2.9.1. Testing
Feb 03, 2026
3.3.1.1. Separation of Suites
Feb 03, 2026
3.3.1.10. Aisles
Feb 03, 2026
3.3.1.11. Door Swing
Feb 03, 2026
3.3.1.12. Sliding Doors
Feb 03, 2026
3.3.1.13. Doors and Door Hardware
Feb 03, 2026
3.3.1.14. Ramps and Stairways
Feb 03, 2026
3.3.1.15. Exterior Passageways
Feb 03, 2026
3.3.1.16. Tapered Treads in a Curved Flight
Feb 03, 2026
3.3.1.17. Capacity of Access to Exits
Feb 03, 2026
3.3.1.18. Guards
Feb 03, 2026
3.3.1.19. Tactile Walking Surface Indicators
Feb 03, 2026
3.3.1.2. Hazardous Substances, Equipment and Processes
Feb 03, 2026
3.3.1.20. Transparent Doors and Panels
Feb 03, 2026
3.3.1.21. Exhaust Ventilation and Explosion Venting
Feb 03, 2026
3.3.1.22. Janitors’ Rooms
Feb 03, 2026
3.3.1.23. Common Laundry Rooms
Feb 03, 2026
3.3.1.24. Obstructions
Feb 03, 2026
3.3.1.25. Signs in Service Spaces
Feb 03, 2026
3.3.1.26. Welding and Cutting
Feb 03, 2026
3.3.1.3. Means of Egress
Feb 03, 2026
3.3.1.4. Public Corridor Separations
Feb 03, 2026
3.3.1.5. Egress Doorways
Feb 03, 2026
3.3.1.6. Travel Distance
Feb 03, 2026
3.3.1.7. Protection on Floor Areas with a Barrier-Free Path of Travel
Feb 03, 2026
3.3.1.8. Headroom and Protruding Objects
Feb 03, 2026
3.3.1.9. Corridors
Feb 03, 2026
3.3.2.1. Scope
Feb 03, 2026
3.3.2.10. Handrails in Aisles with Steps
Feb 03, 2026
3.3.2.11. Outdoor Places of Assembly
Feb 03, 2026
3.3.2.12. Bleachers
Feb 03, 2026
3.3.2.13. Libraries
Feb 03, 2026
3.3.2.14. Stages for Theatrical Performances
Feb 03, 2026
3.3.2.15. Risers for Stairs
Feb 03, 2026
3.3.2.16. Storage Rooms
Feb 03, 2026
3.3.2.17. Safety Glazing
Feb 03, 2026
3.3.2.2. Fire Separations
Feb 03, 2026
3.3.2.3. Reserved
Feb 03, 2026
3.3.2.4. Fixed Seats
Feb 03, 2026
3.3.2.5. Aisles
Feb 03, 2026
3.3.2.6. Corridors
Feb 03, 2026
3.3.2.7. Doors
Feb 03, 2026
3.3.2.8. Fixed Bench-Type Seats Without Arms
Feb 03, 2026
3.3.2.9. Guards
Feb 03, 2026
3.3.3.1. Scope
Feb 03, 2026
3.3.3.2. Fire Separations
Feb 03, 2026
3.3.3.3. Corridors
Feb 03, 2026
3.3.3.4. Doorway Width
Feb 03, 2026
3.3.3.5. Hospitals and Long-Term Care Homes
Feb 03, 2026
3.3.3.6. Protection for Special Care and Treatment Facilities
Feb 03, 2026
3.3.3.7. Contained Use Areas
Feb 03, 2026
3.3.3.8. Handrails
Feb 03, 2026
3.3.4.1. Scope
Feb 03, 2026
3.3.4.10. Resistance to Forced Entry
Feb 03, 2026
3.3.4.11. Retirement Homes
Feb 03, 2026
3.3.4.2. Fire Separations
Feb 03, 2026
3.3.4.3. Storage Rooms
Feb 03, 2026
3.3.4.4. Egress from Dwelling Units
Feb 03, 2026
3.3.4.5. Automatic Locking Prohibition
Feb 03, 2026
3.3.4.6. Sound Transmission
Feb 03, 2026
3.3.4.7. Stairs, Ramps, Landings, Handrails and Guards for Dwelling Units
Feb 03, 2026
3.3.4.8. Protection of Openable Windows
Feb 03, 2026
3.3.4.9. Stud Wall Reinforcement
Feb 03, 2026
3.3.5.1. Scope
Feb 03, 2026
3.3.5.10. Guards
Feb 03, 2026
3.3.5.11. Toe-Boards Required
Feb 03, 2026
3.3.5.2. Fire Extinguishing Systems
Feb 03, 2026
3.3.5.3. Basements
Feb 03, 2026
3.3.5.4. Repair and Storage Garages
Feb 03, 2026
3.3.5.5. Repair Garage Separation
Feb 03, 2026
3.3.5.6. Storage Garage Separation
Feb 03, 2026
3.3.5.7. Vestibules
Feb 03, 2026
3.3.5.8. Reserved
Feb 03, 2026
3.3.5.9. Reserved
Feb 03, 2026
3.3.6.1. Application
Feb 03, 2026
3.3.6.2. Storage of Dangerous Goods
Feb 03, 2026
3.3.6.3. Indoor Storage of Compressed Gases
Feb 03, 2026
3.3.6.4. Storage and Dispensing Rooms for Flammable Liquids and Combustible Liquids
Feb 03, 2026
3.3.6.5. Tire Storage
Feb 03, 2026
3.3.6.6. Ammonium Nitrate Storage
Feb 03, 2026
3.3.6.7. Flooring Materials
Feb 03, 2026
3.3.6.8. Fire Separations in Process Plants
Feb 03, 2026
3.3.6.9. Basements and Pits
Feb 03, 2026
3.4.1.1. Scope
Feb 03, 2026
3.4.1.10. Combustible Glazing in Exits
Feb 03, 2026
3.4.1.11. Exterior Stairway for Long-Term Care Homes
Feb 03, 2026
3.4.1.2. Separation of Exits
Feb 03, 2026
3.4.1.3. Access to Exits
Feb 03, 2026
3.4.1.4. Types of Exit
Feb 03, 2026
3.4.1.5. Exterior Exit Passageways
Feb 03, 2026
3.4.1.6. Restricted Use of Horizontal Exits
Feb 03, 2026
3.4.1.7. Slide Escapes
Feb 03, 2026
3.4.1.8. Transparent Doors and Panels
Feb 03, 2026
3.4.1.9. Mirrors Near Exits
Feb 03, 2026
3.4.2.1. Minimum Number of Exits
Feb 03, 2026
3.4.2.2. Means of Egress from Mezzanines
Feb 03, 2026
3.4.2.3. Distance Between Exits
Feb 03, 2026
3.4.2.4. Travel Distance
Feb 03, 2026
3.4.2.5. Location of Exits
Feb 03, 2026
3.4.2.6. Principal Entrance
Feb 03, 2026
3.4.3.1. Exit Width Based on Occupant Load
Feb 03, 2026
3.4.3.2. Exit Width
Feb 03, 2026
3.4.3.3. Exit Width Reduction
Feb 03, 2026
3.4.3.4. Headroom Clearance
Feb 03, 2026
3.4.4.1. Fire-Resistance Rating of Exit Separations
Feb 03, 2026
3.4.4.2. Exits Through Lobbies
Feb 03, 2026
3.4.4.3. Exterior Passageway Exceptions
Feb 03, 2026
3.4.4.4. Integrity of Exits
Feb 03, 2026
3.4.5.1. Exit Signage
Feb 03, 2026
3.4.5.2. Exit Signs with Tactile Information
Feb 03, 2026
3.4.5.3. Signs for Stairs and Ramps at Exit Level
Feb 03, 2026
3.4.6.1. Surface Finish of Ramps and Stairs
Feb 03, 2026
3.4.6.10. Horizontal Exits
Feb 03, 2026
3.4.6.11. Doors
Feb 03, 2026
3.4.6.12. Direction of Door Swing
Feb 03, 2026
3.4.6.13. Self-Closing Devices
Feb 03, 2026
3.4.6.14. Sliding Doors
Feb 03, 2026
3.4.6.15. Revolving Doors
Feb 03, 2026
3.4.6.16. Door Release Hardware
Feb 03, 2026
3.4.6.17. Reserved
Feb 03, 2026
3.4.6.18. Emergency Crossover Access to Floor Areas
Feb 03, 2026
3.4.6.19. Floor Numbering and Identification of Stair Shafts
Feb 03, 2026
3.4.6.2. Minimum Number of Risers
Feb 03, 2026
3.4.6.3. Maximum Vertical Rise of Stair Flights and Required Landings
Feb 03, 2026
3.4.6.4. Dimensions of Landings
Feb 03, 2026
3.4.6.5. Handrails
Feb 03, 2026
3.4.6.6. Guards
Feb 03, 2026
3.4.6.7. Ramp Slope
Feb 03, 2026
3.4.6.8. Treads and Risers
Feb 03, 2026
3.4.6.9. Curved Flights in Exits
Feb 03, 2026
3.4.7.1. Scope
Feb 03, 2026
3.4.7.2. Fire Escape Construction
Feb 03, 2026
3.4.7.3. Access to Fire Escapes
Feb 03, 2026
3.4.7.4. Protection of Fire Escapes
Feb 03, 2026
3.4.7.5. Stairs
Feb 03, 2026
3.4.7.6. Guards and Railings
Feb 03, 2026
3.4.7.7. Landings
Feb 03, 2026
3.5.1.1. Scope
Feb 03, 2026
3.5.2.1. Required Elevator
Feb 03, 2026
3.5.2.2. Barrier-Free Design
Feb 03, 2026
3.5.3.1. Fire Separations for Elevator Hoistways
Feb 03, 2026
3.5.3.2. Vertical Service Spaces for Dumbwaiters
Feb 03, 2026
3.5.3.3. Fire Separations for Elevator Machine Rooms
Feb 03, 2026
3.5.4.1. Elevator Car Dimensions
Feb 03, 2026
3.6.1.1. Scope
Feb 03, 2026
3.6.1.2. Reserved
Feb 03, 2026
3.6.1.3. Reserved
Feb 03, 2026
3.6.1.4. Storage Use Prohibition
Feb 03, 2026
3.6.1.5. Appliances Installed Outside a Building
Feb 03, 2026
3.6.1.6. Fixed Access Ladders
Feb 03, 2026
3.6.2.1. Fire Separations Around Service Rooms
Feb 03, 2026
3.6.2.2. Service Rooms Under Exits
Feb 03, 2026
3.6.2.3. Service Equipment
Feb 03, 2026
3.6.2.4. Incinerator Rooms
Feb 03, 2026
3.6.2.5. Storage of Combustible Refuse and Recycling
Feb 03, 2026
3.6.2.6. Door Swing for Service Rooms
Feb 03, 2026
3.6.2.7. Electrical Equipment Vaults
Feb 03, 2026
3.6.2.8. Emergency Power Installations
Feb 03, 2026
3.6.2.9. Storage of Oxygen Containers
Feb 03, 2026
3.6.3.1. Fire Separations for Vertical Service Spaces
Feb 03, 2026
3.6.3.2. Foamed Plastic Protection
Feb 03, 2026
3.6.3.3. Linen and Refuse Chutes
Feb 03, 2026
3.6.3.4. Exhaust Duct Negative Pressure
Feb 03, 2026
3.6.3.5. Grease Duct Enclosures
Feb 03, 2026
3.6.4.1. Scope
Feb 03, 2026
3.6.4.2. Fire Separations for Horizontal Service Spaces
Feb 03, 2026
3.6.4.3. Plenum Requirements
Feb 03, 2026
3.6.4.4. Attic or Roof Space Access
Feb 03, 2026
3.6.4.5. Horizontal Service Space Access
Feb 03, 2026
3.6.4.6. Crawl Space Access
Feb 03, 2026
3.6.5.1. Duct Materials
Feb 03, 2026
3.6.5.2. Vibration Isolation Connectors
Feb 03, 2026
3.6.5.3. Tape
Feb 03, 2026
3.6.5.4. Coverings, Linings, Adhesives and Insulation
Feb 03, 2026
3.6.5.5. Insulation and Coverings
Feb 03, 2026
3.6.5.6. Clearance of Ducts and Plenums
Feb 03, 2026
3.6.5.7. Supply, Return, Intake and Exhaust-Air Openings
Feb 03, 2026
3.6.5.8. Return-Air System
Feb 03, 2026
3.7.1.1. Room and Space Height
Feb 03, 2026
3.7.1.2. Residential Room Dimensions
Feb 03, 2026
3.7.1.3. Sleeping Areas in Group B and Child Care Facilities
Feb 03, 2026
3.7.1.4. Sleeping Areas in Camps
Feb 03, 2026
3.7.2.1. Window Areas
Feb 03, 2026
3.7.4.1. Plumbing and Drainage Systems
Feb 03, 2026
3.7.4.10. Glazing
Feb 03, 2026
3.7.4.11. Surface Protection
Feb 03, 2026
3.7.4.12. Floor Drains
Feb 03, 2026
3.7.4.13. Grab Bar Installation
Feb 03, 2026
3.7.4.14. Clearances for Water Closets
Feb 03, 2026
3.7.4.15. Privacy
Feb 03, 2026
3.7.4.16. Water Temperature Control
Feb 03, 2026
3.7.4.17. Drinking Water
Feb 03, 2026
3.7.4.18. Pharmacies
Feb 03, 2026
3.7.4.19. Plumbing Fixtures for Mobile Home Facilities
Feb 03, 2026
3.7.4.2. Plumbing Fixtures, General
Feb 03, 2026
3.7.4.3. Plumbing Fixtures for Assembly Occupancies
Feb 03, 2026
3.7.4.4. Plumbing Fixtures for Care, Care and Treatment or Detention Occupancies
Feb 03, 2026
3.7.4.5. Plumbing Facilities for Dwelling Units
Feb 03, 2026
3.7.4.6. Plumbing Fixtures for Other Residential Occupancies
Feb 03, 2026
3.7.4.7. Plumbing Fixtures for Business and Personal Services Occupancies
Feb 03, 2026
3.7.4.8. Plumbing Fixtures for Mercantile Occupancies
Feb 03, 2026
3.7.4.9. Plumbing Fixtures for Industrial Occupancies
Feb 03, 2026
3.7.5.1. Electrical Systems
Feb 03, 2026
3.7.5.2. Medical Gas Piping
Feb 03, 2026
3.7.5.3. Shielding of X-Ray Equipment
Feb 03, 2026
3.7.6.1. Application
Feb 03, 2026
3.7.6.2. Room Finishes
Feb 03, 2026
3.7.6.3. Location of Plumbing Fixtures
Feb 03, 2026
3.7.6.4. Lavatories, Appliances and Sinks
Feb 03, 2026
3.7.6.5. Hot and Cold Water Supply
Feb 03, 2026
3.7.6.6. Employee Facilities
Feb 03, 2026
3.7.6.7. Sleeping Quarters
Feb 03, 2026
3.8.1.1. Application
Feb 03, 2026
3.8.1.2. Entrances
Feb 03, 2026
3.8.1.3. Barrier-Free Path of Travel
Feb 03, 2026
3.8.1.4. Escalators and Moving Walks
Feb 03, 2026
3.8.1.5. Controls
Feb 03, 2026
3.8.1.6. Illumination
Feb 03, 2026
3.8.2.1. Areas Requiring Barrier-Free Path of Travel
Feb 03, 2026
3.8.2.2. Barrier-Free Paths of Travel to Building Entrances, Exterior Passenger Loading Zones, and Access to Parking Areas
Feb 03, 2026
3.8.2.3. Washrooms Required to be Barrier-Free
Feb 03, 2026
3.8.2.4. Hotels
Feb 03, 2026
3.8.3.1. Accessibility Signs
Feb 03, 2026
3.8.3.10. Urinals
Feb 03, 2026
3.8.3.11. Lavatories, Mirrors and Washroom Accessories
Feb 03, 2026
3.8.3.12. Universal Washrooms
Feb 03, 2026
3.8.3.13. Showers and Bathtubs
Feb 03, 2026
3.8.3.14. Service Counters
Feb 03, 2026
3.8.3.15. Shelves or Counters for Telephones
Feb 03, 2026
3.8.3.16. Drinking Fountains
Feb 03, 2026
3.8.3.16A. Water-Bottle Filling Stations
Feb 03, 2026
3.8.3.17. Platforms
Feb 03, 2026
3.8.3.18. Tactile Attention Indicators
Feb 03, 2026
3.8.3.2. Exterior Walks
Feb 03, 2026
3.8.3.3. Doorways and Doors
Feb 03, 2026
3.8.3.4. Ramps
Feb 03, 2026
3.8.3.5. Passenger Elevating Devices
Feb 03, 2026
3.8.3.6. Wheelchair Spaces and Adaptable Seating
Feb 03, 2026
3.8.3.7. Assistive Listening Systems
Feb 03, 2026
3.8.3.8. Water Closet Stalls and Enclosures
Feb 03, 2026
3.8.3.9. Water Closets
Feb 03, 2026
3.9.1.1. Application
Feb 03, 2026
3.9.1.2. Heating Systems
Feb 03, 2026
3.9.2.1. Flame-Spread Ratings
Feb 03, 2026
3.9.3.1. Building Areas
Feb 03, 2026
3.9.3.2. Spatial Separations
Feb 03, 2026
3.9.3.3. Fire Alarm Systems
Feb 03, 2026
3.9.3.4. Provisions for Firefighting
Feb 03, 2026
3.9.3.5. Portable Fire Extinguishers
Feb 03, 2026
3.9.3.6. Means of Egress
Feb 03, 2026
3.9.3.7. Fuel-Fired Appliances
Feb 03, 2026
3.9.3.8. Washroom Facilities
Feb 03, 2026
3.9.3.9. Barrier-Free Access