(1)
Except as provided in Sentence (2), the hydraulic load in litres from a roof or paved surface is the maximum 15 min rainfall determined in conformance with MMAH Supplementary Standard SB-1, “Climatic and Seismic Data,” multiplied by the sum of
(a)
the area in square metres of the horizontal projection of the surface drained, and
(b)
one-half the area in square metres of the largest adjoining vertical surface. (See Note A-7.4.10.4.(1))
(2)
Flow control roof drains may be installed, provided
(a)
the maximum drain down time does not exceed 24 h,
(b)
the roof structure is designed to carry the load of the stored water,
(c)
one or more scuppers are installed not more than 30 m apart along the perimeter of the building so that
(i)
up to 200% of the 15-minute rainfall intensity can be handled, and
(ii)
the maximum depth of controlled water is limited to 150 mm,
(d)
they are located not more than 15 m from the edge of the roof and not more than 30 m from adjacent drains, and
(e)
there is at least one drain for each 900 m
(3)
Reserved.
(4)
Where the height of the parapet is more than 150 mm or exceeds the height of the adjacent wall flashing,
(a)
emergency roof overflows or scuppers described in Clause (2)(c) shall be provided, and
(b)
there shall be a minimum of 2 roof drains.