(1)
Cladding or sheathing, and interior finish shall be installed on steel stud framing and shall be fastened with screws
(a)
spaced at the appropriate spacing described in Section 9.29., and
(b)
penetrating not less than 10 mm through the metal.
Cladding or sheathing, and interior finish shall be installed on steel stud framing and shall be fastened with screws
spaced at the appropriate spacing described in Section 9.29., and
penetrating not less than 10 mm through the metal.