(See Note A-7.6.3.1.)

(1)

Water distribution systems shall be designed to provide peak demand flow when the flow pressures at the supply openings conform to the plumbing supply fitting manufacturer’s specifications.

(2)

Potable water systems shall be designed, fabricated and installed in accordance with good engineering practice, such as that described in the ASHRAE Handbooks and ASPE Plumbing Engineering Design Handbooks.

(3)

Reserved.

(4)

Pipes that supply a fixture shall have a capacity that will produce a flow in the fixture that will flush the fixture and keep it in a sanitary condition.