(1)
Except as provided in Article 7.5.7.1., the minimum nominal pipe size of an offset relief vent is permitted to be one NPS smaller than the NPS of the stack vent..
Except as provided in Article 7.5.7.1., the minimum nominal pipe size of an offset relief vent is permitted to be one NPS smaller than the NPS of the stack vent..