(1)
Air pressure tests shall be conducted in accordance with the manufacturer’s instructions for the piping materials, and,
(a)
air shall be forced into the system until a gauge pressure of 35 kPa is created, and
(b)
this pressure shall be maintained for at least 15 min without a drop in pressure. (See Note A-7.3.6.5.(1))