(1)

A water pressure test shall consist in applying a water column of at least 3 m to all joints.

(2)

In making a water pressure test,

(a)

every opening except the highest shall be tightly closed with a testing plug or a screw cap, and

(b)

the system or the section shall be kept filled with water for 15 min.