(1)
Lead waste pipe and fittings shall not be used in a water system or as a building sewer.
(2)
When there is a change in nominal pipe size ( NPS) of a lead water closet bend, the change shall be in the vertical section of the bend or made in a manner that prevents the retention of liquid in the bend.